XCG was retained by the Regional District of North Okanagan to complete an updated Design, Operations and Closure Plan for the Greater Vernon Recycling and Disposal Facility.

Design, Operations and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review

XCG completed an updated Design, Operations, and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review for the Revelstoke Landfill. The site, which is contained over two properties, includes a municipal solid waste landfill, transfer station, composting area, marshalling areas, recycling area, weigh scale, and operational infrastructure.

Design, Operations, and Closure Plan, Sechelt Landfill

The Sechelt Landfill is a natural attenuation landfill that has been in operation since 1971. The site includes a municipal solid waste landfill, public drop off area, public weigh scales, and operational infrastructure.

Monitoring, Reporting, and Assessments

XCG was retained by the City of Red Deer to undertake the annual environmental monitoring programs for both the Waste Management Facility and the 1972 Landfill for the years of 2008 to 2017.

Environmental Monitoring, Reporting, and Training

XCG was retained by the Regional District of North Okanagan in 2009 to develop a Hydrogeological Performance Assessment and Design and Operations Plan for the Armstrong Spallumcheen Recycling and Disposal Facility. As a component of this work, XCG developed an Environmental Monitoring Program for the site, which included groundwater, surface water, and landfill gas sampling. This Environmental Monitoring Program was updated in 2012.

Phase I/II Lateral Expansion, Harmac Pulp and Paper Mill Landfill

The Harmac Pulp and Paper Mill Landfill is owned and operated by Harmac Pacific, A Division of Nanaimo Forest Products. The site includes a pulp and paper mill, pulp and paper waste landfill, and operational infrastructure. The landfill accepts the solid waste produced by the pulp and paper mill processes.

Landfill Closure Design Brief & Approval of Evapotranspiration Final Cover System

The Cherryville Recycling and Disposal Facility is located within the Regional District of North Okanagan. XCG prepared the landfill closure design brief, including final contours, evapotranspiration cover, soil balance, erosion and sediment control, surface water management, leachate management, landfill gas management, end use, and environmental monitoring program.

North Berm Lateral Expansion – Nanaimo Regional Landfill

XCG was retained by the Regional District of Nanaimo to undertake the detailed design of the North Berm Lateral Expansion at the Nanaimo Regional Landfill.

Landfill Gas System Main Header Extension and Perimeter Road

XCG undertook the design and construction project management of a landfill gas well field and perimeter road expansion project. The project included the detail design of the berm, perimeter road (constructed of native pit run gravel excavated from on-site quarry), landfill gas header extension, and condensate knockout.

Storm Water Management Plan, Red Deer Waste Management Facility

In 2008, XCG was retained by the City of Red Deer to prepare a Storm Water Management Plan for the Waste Management Facility (WMF). XCG also conducted the detailed design, specifications, tender documents, and construction inspection for the storm water pond for Phase 1 of the WMF landfill.