Monthly Archives: October 2019

  • Permalink Gallery

    Investigate/Delineate First, Dig Later (If At All) -Residential Fuel Oil Release Subsurface Investigation

Investigate/Delineate First, Dig Later (If At All) -Residential Fuel Oil Release Subsurface Investigation

Residential home owners (the Client) noticed drips of fuel oil coming from the bottom of a 910-litre steel fuel oil AST in the basement of their house. They contacted the company that maintains the AST to come and assess/repair the leak. During the tank inspection a section of the tank shell come off, releasing fuel oil to the basement floor.
By |October 30th, 2019|All Projects, Land services, Legal, Insurance, Real Estate and Financial, Sectors, Site Assessment|Comments Off on Investigate/Delineate First, Dig Later (If At All) -Residential Fuel Oil Release Subsurface Investigation|

ANNUAL EXCESS SOIL SYMPOSIUM – III

December 4, 2019
XCG is attending the Annual Excess Soil Symposium - III on December 4, 2019 located at the Deer Creek Golf and Banquet Facility in Ajax, Ontario held by the Canadian Urban Institute.
By |October 28th, 2019|Events, Featured Event, top-news-events|Comments Off on ANNUAL EXCESS SOIL SYMPOSIUM – III|

CBN and Actual Media 2019 Brownie Awards

November 26, 2019
XCG will be attending the Brownie Awards Gala which will be held at the Delta Hotels by Marriott Toronto on Tuesday, November 26, 2019.
By |October 28th, 2019|Events, Featured Event, top-news-events|Comments Off on CBN and Actual Media 2019 Brownie Awards|

National Science Summit 2019

November 26, 2019
XCG will be attending The National Science Summit 2019 on November 26, 2019. 
By |October 28th, 2019|Events, Featured Event, top-news-events|Comments Off on National Science Summit 2019|

Environment Industry Day – ONEIA

November 18, 2019
XCG is attending the annual Environment Industry Day held by The Ontario Environment Industry Association on Monday, November 18, 2019.
By |October 28th, 2019|Events, Featured Event, top-news-events|Comments Off on Environment Industry Day – ONEIA|

A&WMA-OS – Land Use Planning Conference and Course

October 29, 2019
XCG is attending the half day course on Consultant Liability and Expert Witness Testimony on October 29, 2019 at the Delta Guelph Hotel & Conference Centre.
By |October 28th, 2019|Events, Featured Event, top-news-events|Comments Off on A&WMA-OS – Land Use Planning Conference and Course|
  • Permalink Gallery

    Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill

Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill

XCG was retained by Alberta-Pacific Forest Industries Inc. to undertake the detailed design of the 2020 Landfill Expansion at the Alberta-Pacific Landfill (Site). The Alberta-Pacific Landfill is a pulp mill landfill accepting fly ash, grate ash, reject lime, dregs/grits, alum sludge and biosolids wastes from the on-Site pulp plant. XCG undertook the detailed design for the new engineered landfill expansion in 2019 in anticipation of construction in 2020.
By |October 28th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill|
  • Permalink Gallery

    Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill

Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill

XCG undertook a Greenhouse Gas (GHG) Assessment and subsequent reporting for the Knockholt Sub-Regional Landfill (Site) as the Site was exceeding the Environment and Climate Change Canada (ECCC) threshold for GHG reporting of 10,000 tonnes of carbon dioxide equivalents (CO2e) per year.
By |October 28th, 2019|All Projects, Industrial, Land services, Sectors, Solid Waste Services|Comments Off on Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill|

Stage 2 Final Closure Design – Nanaimo Regional Landfill

XCG was retained by the Regional District of Nanaimo to undertake the detailed design (up to 90%) of the Stage Two Final Closure at the Nanaimo Regional Landfill (Site). XCG undertook the detailed design for this partial closure area in 2018 in anticipation of a construction date of 2019 or 2020.
By |October 28th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Stage 2 Final Closure Design – Nanaimo Regional Landfill|