    Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill

Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill

XCG was retained by Alberta-Pacific Forest Industries Inc. to undertake the detailed design of the 2020 Landfill Expansion at the Alberta-Pacific Landfill (Site). The Alberta-Pacific Landfill is a pulp mill landfill accepting fly ash, grate ash, reject lime, dregs/grits, alum sludge and biosolids wastes from the on-Site pulp plant. XCG undertook the detailed design for the new engineered landfill expansion in 2019 in anticipation of construction in 2020.
By |October 28th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Engineering Design Services for 2020 Landfill Expansion – Alberta-Pacific Landfill|
  • Permalink Gallery

    Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill

Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill

XCG undertook a Greenhouse Gas (GHG) Assessment and subsequent reporting for the Knockholt Sub-Regional Landfill (Site) as the Site was exceeding the Environment and Climate Change Canada (ECCC) threshold for GHG reporting of 10,000 tonnes of carbon dioxide equivalents (CO2e) per year.
By |October 28th, 2019|All Projects, Industrial, Land services, Sectors, Solid Waste Services|Comments Off on Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill|

Stage 2 Final Closure Design – Nanaimo Regional Landfill

XCG was retained by the Regional District of Nanaimo to undertake the detailed design (up to 90%) of the Stage Two Final Closure at the Nanaimo Regional Landfill (Site). XCG undertook the detailed design for this partial closure area in 2018 in anticipation of a construction date of 2019 or 2020.
By |October 28th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Stage 2 Final Closure Design – Nanaimo Regional Landfill|

CE3C Conference

October 2-4, 2019
XCG is attending the CE3C Conference on October 2-4, 2019 at the Terminal City Club in Vancouver, B.C. 
By |September 30th, 2019|Events, Featured Event, top-news-events|Comments Off on CE3C Conference|

Due Diligence Investigations

XCG was retained by an industrial services client to conduct multi-site Phase 2 Environmental Site Assessments (ESA) for due diligence purposes as part of a corporate acquisition of several waste management and processing facilities.
By |July 10th, 2019|All Projects, Brownfield Sites, Sectors, Site Assessment|Comments Off on Due Diligence Investigations|
  • Permalink Gallery

    Phase I Environmental Site Assessments and Building Condition Assessments at 46 Sites in Ontario and Quebec

Phase I Environmental Site Assessments and Building Condition Assessments at 46 Sites in Ontario and Quebec

The Phase I ESAs and BCAs were required to be conducted in the retail/commercial or quick-service restaurant buildings on 46 properties within Ontario and Quebec. Due to the large number of individual sites, all of which were occupied by tenants, project management and communication between all parties was critical to the project success.
By |July 9th, 2019|All Projects, Brownfield Sites, Sectors, Site Assessment|Comments Off on Phase I Environmental Site Assessments and Building Condition Assessments at 46 Sites in Ontario and Quebec|

Designated Substances and Hazardous Materials Surveys

XCG Consulting Limited and Cole Engineering Group Ltd. Joint Venture (COLE & XCG JV) were retained by a government agency on behalf of the owner and manager of the facilities to complete Designated Substances and Hazardous Material Surveys (DSHMS), to update the designated substance inventory database, and to serve as a resource for the facilities in the management of their buildings within the project site.
By |July 9th, 2019|All Projects, Government and Public Service, Hazardous Materials Management, Land services, Sectors|Comments Off on Designated Substances and Hazardous Materials Surveys|
  • Permalink Gallery

    Design, Operations, and Closure Plan, Greater Vernon Recycling and Disposal Facility

Design, Operations, and Closure Plan, Greater Vernon Recycling and Disposal Facility

XCG was retained by the Regional District of North Okanagan to complete an updated Design, Operations and Closure Plan for the Greater Vernon Recycling and Disposal Facility.
By |June 27th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Design, Operations, and Closure Plan, Greater Vernon Recycling and Disposal Facility|
  • Permalink Gallery

    Design, Operations and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review

Design, Operations and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review

XCG completed an updated Design, Operations, and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review for the Revelstoke Landfill. The site, which is contained over two properties, includes a municipal solid waste landfill, transfer station, composting area, marshalling areas, recycling area, weigh scale, and operational infrastructure.
By |June 27th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Design, Operations and Closure Plan, Phase 1 Closure Design Brief, and Conformance Review|

Design, Operations, and Closure Plan, Sechelt Landfill

The Sechelt Landfill is a natural attenuation landfill that has been in operation since 1971. The site includes a municipal solid waste landfill, public drop off area, public weigh scales, and operational infrastructure.
By |June 27th, 2019|All Projects, Government and Public Service, Land services, Sectors, Solid Waste Services|Comments Off on Design, Operations, and Closure Plan, Sechelt Landfill|