Phase I ESA & Refinance of a Contaminated Property

XCG was retained in 2015 to conduct a Phase I ESA for refinancing purposes of an industrial property that XCG had previously conducted a Phase I ESA and Phase II ESA in late 2009.
By |July 11th, 2016|All Projects, Industrial, Land services, Projects, Sectors, Site Assessment|Comments Off on Phase I ESA & Refinance of a Contaminated Property|
  • Permalink Gallery

    Phase I & Supplemental Phase II Environmental Site Assessment

Phase I & Supplemental Phase II Environmental Site Assessment

XCG was contracted to complete a Phase I ESA for a downtown Edmonton office tower that shares a three storey underground parking garage with the adjacent property.
By |June 8th, 2016|All Projects, Hazardous Materials Management, Land services, Legal, Insurance, Real Estate and Financial, Projects, Sectors, Site Assessment|Comments Off on Phase I & Supplemental Phase II Environmental Site Assessment|

Phase I ESA, Environmental Review and Phase II Delineation

In early 2016, the owner of the site retained XCG to complete a peer review of the 2015 Phase II ESA, and to determine the best course of action.
By |June 8th, 2016|All Projects, Industrial, Land services, Projects, Site Assessment|Comments Off on Phase I ESA, Environmental Review and Phase II Delineation|

Phase I & II ESAs and Indoor Air Quality Sampling

XCG was retained to complete a Phase I ESA to secure financing for a multi-tenant commercial shopping centre in the Edmonton area.
By |June 8th, 2016|All Projects, Industrial, Land services, Projects, Site Assessment|Comments Off on Phase I & II ESAs and Indoor Air Quality Sampling|

Ontario School Boards’ Insurance Exchange – Uxbridge

Pam Cameron
Business Unit Leader/ Senior Project Manager

Thomas Kolodziej
Operations Leader/ Senior Project Manager

 

Contact Pam or Thomas for help with your Site Assessment, Remediation, and/or Risk Assessment related project.

519.741.5774

Click to Email

  • Permalink Gallery

    Saskatoon Waste Management Centre Integrated Landfill Management Plan

Saskatoon Waste Management Centre Integrated Landfill Management Plan

The Saskatoon Waste Management Centre is owned and managed by the City of Saskatoon. The Centre comprises a landfill encompassing an area of approximately 37.4 hectares (both lined and unlined). The landfill accepts approximately 130,000 tonnes of waste per year.
By |October 26th, 2015|All Projects, Government and Public Service, Land services, Projects, Sectors, Solid Waste Services|Comments Off on Saskatoon Waste Management Centre Integrated Landfill Management Plan|
  • Permalink Gallery

    Redevelopment of a Commercial Building – Downtown Kitchener

Redevelopment of a Commercial Building – Downtown Kitchener

XCG recently assisted 1500985 Ontario Limited in obtaining a Record of Site Condition (RSC) within the City of Kitchener for purposes of the redevelopment of a commercial building in the Downtown core. The City of Kitchener requested that 1500985 Ontario Limited obtain a RSC as a requirement for a building permit to convert a portion of the Property from commercial to residential use.
By |October 8th, 2015|All Projects, Hazardous Materials Management, Land services, Legal, Insurance, Real Estate and Financial, Projects, Sectors, Site Assessment|Comments Off on Redevelopment of a Commercial Building – Downtown Kitchener|

Former Kaufman Footwear Main Plant

XCG conducted a comprehensive site-specific risk assessment (SSRA) at the former Kaufman Footwear manufacturing plant in Kitchener, Ontario. Approximately 225,000 litres (50,000 gallons) of naphtha leaked from an underground storage tank (UST) and created a naphtha plume floating on the water table approximately 10 metres (33 feet) below the ground surface.
  • Permalink Gallery

    Transamerica Life Canada, RAP Implementation & Site Development – Former Sunarhauserman Site

Transamerica Life Canada, RAP Implementation & Site Development – Former Sunarhauserman Site

XCG was hired to replace the consultant that had initially been engaged to do a Phase I Environmental Site Assessment (ESA) and preliminary remedial cost estimate (as the work was found to be inadequate). XCG re-did the Phase I and then designed and implemented a staged series of Phase II and Phase III investigations to delineate and quantify subsurface soil and ground-water impacts on a 30-acre property in Waterloo, Ontario.
By |October 6th, 2015|All Projects, Brownfield Sites, Land services, Legal, Insurance, Real Estate and Financial, Projects, Remediation and Risk Assessment Projects, Sectors, Site Assessment|Comments Off on Transamerica Life Canada, RAP Implementation & Site Development – Former Sunarhauserman Site|

River Park Common Element Condominium, Kingston, ON

Beginning in 2006, Stirling Bridge undertook the remediation and redevelopment of a 5.5 hectare (14 acre) brownfield property in Kingston, Ontario. Environmental site assessment work completed by XCG identified petroleum hydrocarbons contamination on the property, distributed through the soil over a large area behind the former transmission shop.