Residential Fuel Oil Remediation: Simcoe, Ontario
_JPG.jpg)
.jpg)
.jpg)
After over 3 years of remediation activities and stalled progress by a remediation contractor, Dumfries Mutual Insurance wanted a second opinion on a fuel oil leak at a residential property near Simcoe, Ontario. They contacted XCG for a second opinion and asked for a review of the process, the on-going remedial costs and success to date of the remediation activities for the project.
Following a comprehensive review of the remedial status and the on-going remedial cost, XCG recommended that Dumfries adjust the process to a more aggressive and active approach. The adjusted approach included:
-
further delineating the fuel oil impacts in soil and groundwater;
-
the design of an excavation program that included the installation of helical piles to support an existing garage building prior to removal of the impacted soil below it;
-
subcontracting an excavation contractor to remove the impacted source soil below the garage building;
-
monitoring the excavation activities and collecting verification samples;
-
identifying and overseeing removal of an unknown fuel oil underground storage tank;
-
preparing a summary report of remedial activities;
-
preparing a Phase One and a Phase Two Environmental Site Assessment Report and filing a Record of Site Condition (RSC) completing the remediation activities.
The project was completed in less than 2 years from start until filing of the RSC and allowed the receiver of the property to place the property for sale. The total project cost was $137,000 of which XCG’s consulting and analytical fees were $40,000.