XCG has completed a wide range of environmental engineering projects for a diverse group of clients across North America. Learn more about the solutions we provide by exploring our project portfolio below.

Landfill Gas and Greenhouse Gas Reporting – Knockholt Sub-Regional Landfill

XCG undertook a Greenhouse Gas (GHG) Assessment and subsequent reporting for the Knockholt Sub-Regional Landfill (Site) as the Site was exceeding the Environment and Climate Change Canada (ECCC) threshold for GHG reporting of 10,000 tonnes of carbon dioxide equivalents (CO2e) per year.

Oshawa Harbour Risk Assessment (2017), City of Oshawa

In the period between 2014 and 2017, XCG was retained by the City of Oshawa to obtain a Record of Site Condition (RSC) for the former Marina Lands and West Wharf Lands located at the southeast corner of Harbour Road and Simcoe Street South (subject site). This former industrial/commercial site is intended to be converted to parkland and therefore triggers the requirement for a RSC.

Landfill Gas System Main Header Extension and Perimeter Road

XCG undertook the design and construction project management of a landfill gas well field and perimeter road expansion project. The project included the detail design of the berm, perimeter road (constructed of native pit run gravel excavated from on-site quarry), landfill gas header extension, and condensate knockout.

Delineation and Remediation of Soil and Groundwater Impacts

XCG was retained by Barnes Group Inc. (BGI) to conduct site assessment and remediation activities at a former automotive component manufacturing facility located at 3100 Mainway, Burlington, Ontario.

Groundwater Remediation and RSC Filing

In 2009, XCG Consulting Limited (XCG) was contracted by Ontario School Boards’ Insurance Exchange (OSBIE) and the Durham District School Board (DDSB) to peer review the investigation and remediation activities at the Sunderland Public School (PS) in Sunderland, Ontario.

Site-Specific Environmental Management Plan and Environmental Monitoring

XCG was retained by Matrix NAC to provide a Site Specific Environmental Management Plan (Environment, Traffic, Ecological, Archaeological) for the Napanee Generating Station (NGS).

Design and Closure Plan, Valemount Regional Landfill

XCG developed the Closure Plan for the Valemount Regional Landfill.

Expansion of Landfill Gas Collection and Flaring System, Phases 1, 2, and 3

XCG was retained in 2009 to undertake the detailed design, tendering, construction oversight and contract administration for Phases 1, 2, and 3 of the landfill gas collection and flaring system at the Tom Howe Landfill.

Soil Verification Sampling following Removal of Impacted Soil Beneath a Commercial Building

XCG was retained to complete confirmatory soil sampling of the limits of an excavation in the basement of a multi-use commercial and residential building in Toronto, Ontario.

Environmental Remediation of a Brownfield Site Followed by Restoration After a Fire

XCG was retained to conduct the studies necessary to file Records of Site Condition (RSCs) with the Ontario Ministry of the Environment and Climate Change (MOECC) for a brownfield property in Kingston, Ontario, to allow for a change to residential land use. The property was being redeveloped as a 140-unit student apartment complex.