In April 2016, XCG was contracted by the Client to continue River & Shoreline Assessment work started by the City of Kitchener following a used motor oil spill from the Client property that entered a storm sewer catch basin that discharged to the Grand River.


The City of Kitchener was notified of the impact to the Grand River and City resources were used to respond. The City contracted Ground Force Environmental Inc. (Ground Force) to complete remediation work on the river, including the installation of various oil containment and oil absorbent booms near the storm sewer outfall, excavation and removal of petroleum-impacted soil from the banks of the river, removal of impacted water using a vacuum truck, and collection of soil and water samples for laboratory analysis to characterize the hydrocarbon impacts pre- and post- remediation. In late May 2016, following the initial remediation work, XCG took over responsibility for the site and reviewed the remediation work completed on the site and all the analytical results for soil and groundwater sampling that were provided by the City. Upon discussion with the Ontario Ministry of Environment and Climate Change (MOECC), XCG determined the ocean boom installed as a temporary floating barrier could be removed from the river. XCG observed the removal of the ocean barrier, and continued to monitor the site for any evidence of petroleum hydrocarbon compound (PHC) impacts. 


In June 2016, XCG viewed all areas of the river originally reported to have been contaminated by the spill. XCG did not observe any visual evidence of impacted soil along the river. Surface soil samples were taken in the area of the oil spill and analyzed for PHCs. All analytical results for surface samples were non-detect, and below the MOECC guidelines. XCG determined that the remaining remediation barriers, the oil booms, and the silt curtain, could be removed from the Grand River site. 


In October 2016, following the completion of the remediation work, XCG oversaw the restoration of the site completed by Ground Force and Moser Landscape Group Inc. The restoration work included the grading and seeding of pathways created for access to the river, laying of erosion matting, and planting of shrubs in the area of the spillway down to the river. Through working together with the City of Kitchener and the MOECC, XCG was successful in providing the required environmental information to the satisfaction of the MOECC and the Client to determine the oil spill had been remediated. XCG saw the project to completion, leaving the area restored to grow back to its natural state before the spill.

© 2024 | XCG, a division of Trace Associates Inc.

memberCeLogo_small.png

KITCHENER OFFICE

820 Trillium Drive,

Kitchener On, N2R 1K4

519.741.5774

KINGSTON OFFICE

Suite 102 - 4 Cataraqui Street,

Woolen Mill, East Wing, Kingston On, K7K 1Z7

613.542.5888

CALGARY OFFICE

37 Richard Way SW,

Calgary, AB T3E 7M8

1.877.418.7223

bottom of page